Civil Engineering :: Construction Planning and Mgmt
- Frequency distribution curves
- Economic saving of time results by crashing
- If the output of a drag-line for 90° angle of swing at optimum depth of cut is X, then the output for 120° angle of swing at 120 % of optimum depth of cut will be
-
A wheeled tractor hauling unit is working on firm earth. The total loaded weight distribution of this unit is:
Drive wheels: 25000 kg
Scraper wheels: 10000 kg
If the coefficient of traction for wheeled tractor on firm earth is 0.5, the rimpull which this tractor can exert without slipping is - Critical path method
- The time by which activity completion time can be delayed without affecting the start of succeeding activities, is known as
- If the scheduled completion time of a project is more than the earliest expected time for completion of the project, then the probability of completion of the project within the scheduled completion time will be
- The direct cost of a project with respect to normal time is
- Whenever an activity has zero total float, then
- While filling the tender for any work, the contractor considers