  1. For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is

  2. A.

    0.90 m3

    B.

    0.94 m3

    C.
    0.98 m3
    D.
    1.00 m3

  3. For the construction of buildings, the subheads of the estimate are

  4. A.

    Earthwork, Concrete work, Brick work

    B.

    Brickwork, Stone work, Roofing

    C.

    Brickwork Flooring, Wood work, Steel work

    D.

    Plastering or pointing, finishing, water supply and sanitary work

    E.

    All the above.


  5. The measurement is made for stone work in square metre in case of

  6. A.

    Wall facing

    B.

    Columns, lintels, copings

    C.
    Building work
    D.

    Dressed stones in Chajjas

    E.

    (a) and (d) of the above.


  7. The 'centre line method' is specially adopted for estimating

  8. A.

    Circular buildings

    B.

    Hexagonal buildings

    C.

    Octagonal buildings

    D.
    Other geometrical shaped buildings
    E.

    All the above.


  9. The value of 'A' of Indian type W.C. shown in the given figure is :

  10. A.

    25 cm

    B.

    30 cm

    C.

    40 cm

    D.

    45 cm


  11.  Referring of given figure, pick up the correct statement from the following of given figure, pick up the correct statement from the following

     

     

  12. A.

    The total length of centre line of four walls is 20 m

    B.

    Length of long wall out-to-out is 6.80 m

    C.

    Length of short walls in-to-in is 3.20 m

    D.

    All the above.


  13. Size, capacity and materials need be specified for

  14. A.

    Bib-cocks

    B.

    Stop-cocks

    C.

    Ferrules

    D.

    Ball valves

    E.

    All the above.


  15. A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is

  16. A.

    500 m3

    B.

    1000 m3

    C.

    1500 m3

    D.

    2000 m3


  17. The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is

  18. A.

    1.00 cum

    B.

    2.00 cum

    C.

    3.00 cum

    D.

    4.00 cum


  19. Anti-siphonage pipe is connected to

  20. A.
    Main soil pipe
    B.

    Bottom of P trap W.C.

    C.

    Top of P trap W.C.

    D.

    Side of water closet.