Civil Engineering :: Estimating and Costing
-
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by prismoidal formula, is
-
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended
-
Pick up the correct statement from the following:
-
The weight of an item is measured correct to nearest
-
The rate of payment is made for 100 cu m (per % cu m) in case of
-
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is
-
Pick up the incorrect statement from the following:
-
The measurement is made in square metre in case of
-
Berms are provided in canals if these are
-
The brick work is not measured in cu m in case of
A.
No deduction is made for the volume occupied by reinforement |
B.
No deduction is made for the openings upto 0.1 sq.m |
C.
No deduction is made for volumes occupied by pipes, not exceeding 100 sq.cm in cross-section |
D.
No deductions are made for the ends of dissimilar structures up to 500 sq.cm cross-sectional area |
E.
None of these. |