  1. Size, capacity and materials need be specified for

  2. A.

    Bib-cocks

    B.

    Stop-cocks

    C.

    Ferrules

    D.

    Ball valves

    E.

    All the above.

    View Answer

    Workspace

    Answer : Option E

    Explanation :

    No answer description available for this question.