Home / Mechanical Engineering / Industrial Engineering and Prod'n Mgmt :: section-1

Mechanical Engineering :: Industrial Engineering and Prod'n Mgmt

  1. Dispatching

  2. A.

     Prescribes the sequence of operations to be followed

    B.

     Determines the programme for the operations

    C.

     Is concerned with the starting of processes

    D.

     Regulates the progress of job through various processes


  3. Material handling in automobile industry is done by

  4. A.

     Overhead crane

    B.

     Trolley

    C.

     Belt conveyor

    D.

     All of the above


  5. Time study is carried out

  6. A.

     By finding all the significant informations regarding the job, work place and machine tool etc

    B.

     By breaking up each operation into small elements which are measurable with the help of the measuring device accurately

    C.

     By observing and recording the time taken by the operator for an operation

    D.

     All of the above


  7. Work study is most useful

  8. A.

     Where production activities are involved

    B.

     In judging the rating of machines

    C.

     In improving industrial relations

    D.

     In judging the output of a man and improving it


  9. In the cost structure of a product, the selling price is determined by the factors such as

  10. A.

     Sales turn over

    B.

     Lowest competitive price

    C.

     Various elements of the cost

    D.

     All of the above


  11. Replacement studies are made on the following basis

  12. A.

     Annual cost method

    B.

     Rate of return method

    C.

     Total life average method

    D.

     Any one of the above


  13. Simplex method is the method used for

  14. A.

     Value analysis

    B.

     Network analysis

    C.

     Linear programming

    D.

     Queuing theory


  15. The main disadvantage of line organisation is

  16. A.

     Top level executives have to do excessive work

    B.

     Structure is rigid

    C.

     Communication delays occur

    D.

     All of the above


  17. A systematic job improvement sequence will consist of

  18. A.

     Motion study

    B.

     Time study

    C.

     Job enrichment

    D.

     All of these


  19. The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store

  20. A.

     Inflated system

    B.

     Primary cost method

    C.

     Current value method

    D.

     Fixed price method