Home / CSE MCQs / SAP QM ::

CSE MCQs :: SAP QM

  1. Factual approach to decision making is a
  2. A.
    Quality products
    B.
    Quality principle
    C.
    Quality procedure
    D.
    None

  3. Which finger is used to strike the slash?
  4. A.
    Right middle
    B.
    J-Finger
    C.
    Right Pinky
    D.
    K-finger

  5. In manufacturing with QM, you can confirm the inspection results to QM in two ways- can call up results recording in QM directly from the process instruction (PI) sheet or can copy summarized inspection results from process messages. The above is true for
  6. A.
    Only Discrete Manufacturing
    B.
    Only Process Manufacturing
    C.
    Either Discrete or Process Manufacturing
    D.
    Neither Discrete nor Process Manufacturing

  7. Which of the following Transaction code is used for scheduling UD for Production lot?
  8. A.
    QA39
    B.
    QA40
    C.
    QA41
    D.
    QA42

  9. Which type of control charts are based on the specified tolerance and control the share of scrap in the process?
  10. A.
    Acceptance charts
    B.
    Shewhart charts
    C.
    mean-value chart
    D.
    Statistical Graphics

  11. In Audit Management, the information relevant to the data elements becomes available if the
  12. A.
    Audit object can be defined by Data elements from repository resulting from the Information Record maintained
    B.
    Audit object can be defined by Data elements from a repository such as a combination of supplier and material
    C.
    Audit objects are cleared through the Quality Management processes
    D.
    Pre-Audit approvals are in place

  13. Quality Management data is primarily maintained at the
  14. A.
    Cost Centre level
    B.
    Plant level
    C.
    Company code level
    D.
    Sales Organization level

  15. Control of documents is a
  16. A.
    Documentation
    B.
    Quality procedure
    C.
    Data Procedure
    D.
    None

  17. Which of the following is not a control parameter that can be set on the material master for Quality Management.
  18. A.
    MRP Type
    B.
    Inspection Type
    C.
    Sample Determination
    D.
    Requirements for the vendor's QM system

  19. Which of the following Transaction code is used to create an Inspection Plan?
  20. A.
    QS21
    B.
    QS31
    C.
    QDV1
    D.
    QP01