Home / CSE MCQs / SAP QM ::

CSE MCQs :: SAP QM

  1. You want to record defects in inspection lot processing. In the Implementation Guide (IMG), which elements can you combine in a defect report type?
  2. A.
    Confirmation Profile, Catalog Profile, Notification Type
    B.
    Confirmation Profile, Defect Class, Origin of the Catalog Profile
    C.
    Confirmation Profile, Catalog Profile, Defect Type, Work Center
    D.
    Confirmation Profile, Catalog Profile, Origin of the Catalog Profile

  3. The automatic determination of samples is a part of the inspection process. Which of the following are NOT part of the sample determination process?
  4. A.
    Sampling Scheme
    B.
    Sampling Procedure
    C.
    Dynamic Modification Rule
    D.
    Sampling Condition

  5. QM Standard forms are displayed by using
  6. A.
    QCCM
    B.
    QCCN
    C.
    QCCF
    D.
    None

  7. Which type of task list defines process steps independently of the inspection lot?
  8. A.
    Routing
    B.
    Inspection plan
    C.
    Reference object set
    D.
    Master recipe

  9. During an audit, you document a finding. In the audit structure, what can link an audit and a quality notification?
  10. A.
    Corrective/preventive action
    B.
    Audit question
    C.
    Business partner
    D.
    Attached document

  11. With reference to Multiple Specifications in Inspection Planning, which of the following statements are true?
  12. A.
    Multiple specifications must be stored in an inspection plan
    B.
    You cannot create multiple specifications using the Engineering Workbench (EWB)
    C.
    You can create the multiple specifications in a new inspection plan, but not on an existing inspection plan
    D.
    You need to define object types permitted for multiple specifications, but not objects for each object types

  13. Which is true regarding physical-sample drawing
  14. A.
    Physical-sample drawing can be subject to a separate confirmation process using a sample scheme
    B.
    Physical-sample drawing cannot be subject to a separate confirmation process as it is integral part of the whole process
    C.
    Physical-sample drawing can be subject to a separate confirmation process using a status scheme
    D.
    No separate confirmation process can be applied to physical-sample drawing unless and until it is a failed case

  15. There are ____ quality principles
  16. A.
    10
    B.
    5
    C.
    8
    D.
    19

  17. QMP means
  18. A.
    Quality Management Performance
    B.
    Quality Management Principle
    C.
    Quality Management Plan
    D.
    None

  19. The automatic determination of samples is a part of the inspection process. Which of the following are NOT part of the sample determination process?
  20. A.
    Sampling Scheme
    B.
    Sampling Procedure
    C.
    Dynamic Modification Rule
    D.
    Sampling Condition