- Pick up the correct statement from the following:
- Pick up the correct statement from the following:
-
Referring of given figure, pick up the correct statement from the following:
- The height of the sink of wash basin above floor level is kept
- The unit of measurement is per quintal for the following:
- The expected out turn for earth work in excavation in ordinary soil per workman per day is
- The expected out turn of 2.5 cm cement concrete floor per mansion per day
- Cost of fittings and their fixing is specified for the following sanitary fittings
|
A.
The estimated value of the work excluding the amount for contingencies, work charged establishment, tool and plants, is called work value |
|
B.
The actual expenditure involved to complete a work including incidental, establishment and travelling charges, is called actual cost |
|
C.
The formal acceptance by the administrative department for incurring an expenditure on the work, is called administrative approval |
|
D.
All the above |
|
A.
The incidental expenses of a miscellaneous character which could not be predicted during preparation of the estimate, is called contingencies |
|
B.
Additional supervising staff engaged at work site, is called work charged establishment |
|
C.
Detailed specifications specify qualities, quantities and the proportions of materials to be used for a particular item |
|
D.
All the above |