Civil Engineering :: Construction Management
-
Construction team means
-
Pick up the correct network for the activities of pouring concrete, erection of form work, removal of form work and curing of concrete from the following:
-
A construction schedule is prepared after collecting
-
Site order book is used for recording
-
An Executive Engineer may have powers upto
-
The main principle of an organisation, is
-
The estimated time required to perform an activity, is known as
-
A CPM family includes
-
The time which results in the leasi, possible construction cost of an activity, is known
A.
1. Pouring of Concrete |
B.
1. Erection of form work |
C.
1. Removal of form work |
D.
1. Pouring of concrete |