  1. To run the old system and the new system at the same time for a specified period, the system implementation approach used is

  2. A.
    pilot
    B.
    phased
    C.
    parallel
    D.
    direct
    E.
    None of the above

  3. The mistake, committed by interchanging two digits in a numeric held, during data entry, is called

  4. A.
    transposition error
    B.
    transcription error
    C.
    Beta testing error
    D.
    Alpha testing error
    E.
    None of the above

  5. Decision tree uses

  6. A.
    pictorial depictation of alternate conditions
    B.
    nodes and branches
    C.
    consequences of various depicted alternates
    D.
    All of the above
    E.
    None of the above

  7. Problem analysis is done during

  8. A.
    system design phase
    B.
    systems analysis phase
    C.
    before system test
    D.
    All of the above
    E.
    None of the above

  9. Top-down programming is

  10. A.
    a group of related fields
    B.
    a map of the programmer's view of the data
    C.
    an approach in which the top module is first tested then program modules are added from the highest level to the lowest level
    D.
    a series or group of components that perform one or more operations of a more complex system
    E.
    None of the above

  11. A decision table facilitates conditions to be related to

  12. A.
    actions
    B.
    programs
    C.
    tables
    D.
    operation
    E.
    None of the above

  13. On the feasibility committee, department representatives serve as:

  14. A.
    direct users of the new system
    B.
    liaison to their departments
    C.
    ready sources of information
    D.
    All of the above
    E.
    None of the above

  15. A _____ is an outline of a process that keeps develop successful information systems

  16. A.
    System Development Life Cycle
    B.
    CASE tool
    C.
    Phased Conversion
    D.
    Success Factors
    E.
    Move of the above

  17. A branch office, location or other data processing centres, where a newly developed system is used under normal operating conditions for several months, to test it, is called

  18. A.
    beta test data
    B.
    alpha test data
    C.
    string test data
    D.
    system test data
    E.
    None of the above

  19. An appraisal, of a system's performance after it has been installed, is called system

  20. A.
    planning
    B.
    review
    C.
    maintenance
    D.
    batch Processing
    E.
    None of the above