Civil Engineering :: Construction Management
-
Frequency distribution curves
-
Pick up the correct statement from the following:
-
The three time estimates for the activities of the network shown in the given figure are shown above their arrows. The earliest expected time for the event 4, is
-
Optimistic time, most likely time and pessimistic times for the activities of a network in the given figure are written above their arrows. If the contractual obligation time for the project is 75, the latest occurrence time for the event 2, is
-
While filling the tender for any work, the contractor considers