Home / Mechanical Engineering / Industrial Engineering and Production Management :: Section 4

Mechanical Engineering :: Industrial Engineering and Production Management

  1. The interchangeability can be achieved by

  2. A.
    standardisation
    B.
    better process planning
    C.
    bonus plan
    D.
    better product planning

  3. Travel charts are used to

  4. A.
    analyse material handling
    B.
    determine inventory control difficulties
    C.
    plan material handling procedure and routes
    D.
    all of the above

  5. The value engineering technique in which experts of the same rank assemble for product development is called

  6. A.
    Delphi
    B.
    brain storming
    C.
    morphological analysis
    D.
    direct expert comparison

  7. Process layout is employed

  8. A.
    where low volume of production is required
    B.
    where similar jobs are manufactured on similar machines
    C.
    where machines are arranged on functional basis
    D.
    all of the above

  9. Which one of the following techniques is used for determining allowances in time study?

  10. A.
    Acceptance sampling
    B.
    Linear regression
    C.
    Performance rating
    D.
    Work sampling

  11. PERT

  12. A.
    provides an approach for keeping planning up-to-date
    B.
    provides a way for management to require that planning be done on a uniform and logical basis
    C.
    permits management to foresee quickly the impact of variations from the plan
    D.
    all of the above