Home / Mechanical Engineering / Industrial Engineering and Prod'n Mgmt :: Discussion

Discussion :: Industrial Engineering and Prod'n Mgmt

  1. One of the basic essentials of an incentive plan is that

  2. A.

     A differential piece rate system should exist

    B.

     Minimum wages should be guaranteed

    C.

     Provide incentive to group efficiency performance

    D.

     All standards should be based on time studies

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    One of the basic essentials of an incentive plan is that All standards should be based on time studies


Be The First To Comment