Discussion :: Industrial Engineering and Prod'n Mgmt
- PMTP (predetermined motion time systems) include
|
A.
MTM (method time measurement) |
|
B.
WFS (work factor systems) |
|
C.
BNTS (basic motion time study) |
|
D.
All of the above |
Answer : Option D
Explanation :
PMTP (predetermined motion time systems) include
- MTM (method time measurement)
-WFS (work factor systems)
- BNTS (basic motion time study)
Be The First To Comment

Whatsapp
Facebook