  1. Given the following,
    Excavating/loading machine     Transportation scheme
    P Bucket Wheel Excavator        1 Mine tub
    Q Continuous Miner                  2 Armoured flexible chain conveyor
    R Shearer                                     3 Shiftable Conveyor
    S Load Haul Dumper                 4 Shuttle car
    the correct match is
  2. A.
    P-3, Q-2, R-4, S-1
    B.
    P-3, Q-4, R-2, S-1
    C.
    P-3, Q-2, R-1, S-4
    D.
    P-1, Q-4, R-3, S-2

    View Answer

    Workspace

    Answer : Option B

    Explanation :

    -NA-