Home / Civil Engineering / Water Supply Engineering :: Discussion

Discussion :: Water Supply Engineering

  1. The intake opening is generally covered by a screen to prevent entry of debris etc. and its level is kept

  2. A.
    at the level of water of the source
    B.
    at the bottom of water of the source
    C.
    at about 2.5 m above the bottom
    D.
    none of these.

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    No answer description available for this question. Let us discuss.