Discussion :: Water Supply Engineering
-
Detention period of a settling tank is
A.
average theoretical time required for water to flow through the tank
|
B.
time required for flow of water to fill the tank fully
|
C.
average time for which water is retained in tank
|
D.
ratio of volume of basin of a sedimentation tank to the rate of flow
|
E.
all the above.
|
Be The First To Comment