  1. Pick up the correct statement from the following:

  2. A.

     Inlets are provided on the road surface at the lowest point for draining rain water

    B.

     Inlets are generally provided at an interval of 30 m to 60 m along straight roads

    C.

     Inlets having horizontal openings, are called horizontal inlets

    D.

     All the above

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    Explanation Not Provided