Home / Civil Engineering / Waste Water Engineering :: Discussion

Discussion :: Waste Water Engineering

  1. In a grit chamber of a sewage treatment plant,

  2. A.

     Flow velocity 0.15 m to 0.3 m/sec is kept

    B.

     Depth of 0.9 m to 1.20 m is kept

    C.

     One minute of detention period is kept

    D.

     All the above

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    Explanation Not Provided


Be The First To Comment