Home / Civil Engineering / Waste Water Engineering :: Discussion

Discussion :: Waste Water Engineering

  1.  

    For efficient working of a sewer, it must be ensured that

  2. A.

    minimum velocity of 0.45 m/sec, is maintained at its minimum flow

    B.
    a maximum velocity of 0.90 m/sec, is maintained at its maximum flow
    C.

    both (a) and (b)

    D.

    neither (a) nor (b).

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    No answer description available for this question.