Discussion :: Waste Water Engineering
-
In case of Imhoff tanks,
A.
|
|
B.
detention period is 2 hours |
|
C.
the velocity of flow is restricted to 0.30 m/minute |
|
D.
surface loading is limited to 30, 000 litres/m of plan area per day |
|
E.
All the above. |
Answer : Option E
Explanation :
No answer description available for this question.
Be The First To Comment