Home / Civil Engineering / Waste Water Engineering :: Section 1

Civil Engineering :: Waste Water Engineering

  1.  

    The asbestos cement pipes are generally laid

  2. A.
    horizontally
    B.

    vertically

    C.

    at an angle of 30°

    D.

    at an angle of 60°.


  3. Chlorination of water is done for the removal of

  4. A.

    bacterias

    B.

    suspended solids

    C.

    sediments

    D.

    hardness.


  5.  

    For evaporation and measurement of settlable solids, the apparatus used, is

  6. A.

    a jar

    B.

    a breaker

    C.

    a test tube

    D.

    an Imhoff cone.


  7. In SI units the power of sound is represented in

  8. A.

    kgs

    B.

    joules

    C.

    neutons

    D.
    watts.

  9.  

    A rain sanitary sewer is constructed to carry

  10. A.

    sanitary sewage

    B.
    storm sewage
    C.

    surface water

    D.
    ground water
    E.

    all the above.


  11.  

    The sewage is pumped up

  12. A.

    from low lying areas

    B.

    from flat areas

    C.

    from basements

    D.

    across a high ridge

    E.

    all the above.


  13.  

    Removal of oil and grease from sewage, is known

  14. A.

    screening

    B.
    skimming
    C.

    filtration

    D.
    none of these.

  15.  

    The gas which may cause explosion in sewers, is

  16. A.

    carbondioxide

    B.
    methane
    C.

    ammonia

    D.

    carbon monoxide.


  17. In sewers the effect of scouring is more on

  18. A.
    top side
    B.

    bottom side

    C.

    horizontal side

    D.

    all sides.