  1. High pressure grouting is generally restored for concreting in the lining if the rock strata is:

  2. A.
    highly fissured
    B.
    poor
    C.
    likely to get seepage of water
    D.
    All of the above.

  3. For hauling muck from the tunnel, the following type of muck-car is used :

  4. A.
    muck box
    B.
    balle-ship
    C.
    side dump car
    D.
    U-bottom
    E.
    All of these.

  5. Which one of the following methods is adopted for permanent drainage of tunnels :

  6. A.
    provision of longitudinal drains
    B.
    continuous open drains
    C.
    concrete lining
    D.
    grouting with cement or chemicals
    E.
    All the above.