  1. If h1 and h2 are the differences in level between ground and the formation levels, m is the slope of the sloping sides. D is the distance between the cross sections then, prismoidal correction for a level section is

  2. A.

    D/2m(h1 - h2)

    B.

    D/3m(h1 - h2)

    C.

    D/6m(h1 - h2)2

    D.

    D/6m(h1 - h2)3

    E.

    D/6m(h1 + h2)2

    View Answer

    Workspace

    Answer : Option C

    Explanation :

    No answer description available for this question