Home / Civil Engineering / Surveying :: Discussion

Discussion :: Surveying

  1. The distances AC and BC are measured from two fixed points A and B whose distance AB is known. The point C is plotted by intersection. This method is generally adopted in

  2. A.

    chain surveying

    B.

    traverse method of surveys

    C.

    triangulation

    D.
    none of these.

    View Answer

    Workspace

    Answer : Option A

    Explanation :

    No answer description available for this question.


Be The First To Comment