Home / Civil Engineering / Surveying :: Discussion

Discussion :: Surveying

  1. In levelling operation,

  2. A.

    The first sight on any change point is a back sight

    B.

    The second sight on any change point is a fore sight

    C.

    The line commences with a fore sight and closes with a back sight

    D.

    The line commences with a back sight and closes with a foresight.

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    No answer description available for this question. 


Be The First To Comment