Home / Civil Engineering / Irrigation Engineering :: Discussion

Discussion :: Irrigation Engineering

  1. The difference in level between the top of a bank and supply level in a canal, is called

  2. A.

     Berm

    B.

     Free board

    C.

     Height of bank

    D.

     None of these

    View Answer

    Workspace

    Answer : Option B

    Explanation :

    Explanation Not Provided


Be The First To Comment