  1. Pick up the incorrect statement from the following:

  2. A.

     In free flooding irrigation, water is admitted at one corner of a field and is allowed to spread over the entire area

    B.

     In check method of irrigation, the field is divided into smaller compartments and water is admitted to each in turn

    C.

     In furrow irrigation water is admitted between the rows of plants in the field

    D.

     None of these


  3. A deficit of sediments in flowing water may cause a river

  4. A.

     Meandering type

    B.

     Aggrading type

    C.

     Degrading type

    D.

     Sub-critical type


  5. Which one of the following statements is correct?

  6. A.

     The canal system and the drainage system are complementary

    B.

     The canal system runs on ridges, gets divided into smaller channels and spreads its water on the land

    C.

     The drainage system runs along the lowest line, collects drainage water from the slopes and joins the main stream

    D.

     All the above


  7. Cyclonic precipitation is caused by lifting of an air mass due to

  8. A.

     pressure difference

    B.

     temperature difference

    C.

     natural topographical barriers

    D.

     all of the above


  9. If the height of the hydraulic gradient line above the floor of thickness t is h and the specific gravity of the material of the floor is G, the minimum thickness t of the floor downstream of the crest-wall, is given by the equation

  10. A.

     t = (h + 1)/(G + t)

    B.

     t = (h - 1)/(G + t)

    C.

     t = (h - 1)/(G - t)

    D.

     t = (h + 1)/G


  11. Side slopes generally kept for canals in loam soil, are:

  12. A.

     1 : 1 in cutting and 1½ : 1 in filling

    B.

     1½ : 1 in cutting and 2 : 1 in filling

    C.

     Neither (A) nor (B)

    D.

     Both (A) and (B)


  13. If the R.L’s of canal bed level and high flood level of drainage are 212.0 m and 210.0 m respectively, then cross drainage work will be

  14. A.

     aqueduct

    B.

     superpassage

    C.

     syphon

    D.

     syphon aqueduct


  15. The most suitable location of a canal head work, is

  16. A.

     Boulders stage of the river

    B.

     Delta stage of the river

    C.

     Rock stage of the river

    D.

     Trough stage of the river


  17. Cross regulators in main canals are provided

  18. A.

     To regulate water supply in the distributaries

    B.

     To increase water head upstream when a main canal is running with low supplies

    C.

     To overflow excessive flow water

    D.

     None of these


  19. Process of meandering is due to

  20. A.

     Sediment load of streams

    B.

     Discharge and hydraulic properties of streams

    C.

     Relative erodibility of the bed and banks

    D.

     All the above