To avoid vapourisation, pipe lines are laid over the ridge so that these are above the hydraulic gradient line, not more than
2.4 m
6.4 m
10.0 m
5.0 m.
View Answer
Workspace
Share
Copy URL
Answer : Option B
Explanation :
No answer description available for this question