Discussion :: Estimating and Costing
-
Pick up the correct statement from the following:
A.
In order to check up the average depth of excavation, 'Dead mans' are left at the mid-widths of borrow pits |
B.
The earthwork calculation in excavation is made from the difference in levels obtained with a level |
C.
The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers |
D.
All the above. |
Answer : Option D
Explanation :
No answer description available for this question.