  1. Pick up the correct statement from the following:

  2. A.

    In order to check up the average depth of excavation, 'Dead mans' are left at the mid-widths of borrow pits

    B.

    The earthwork calculation in excavation is made from the difference in levels obtained with a level

    C.

    The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers

    D.

    All the above.

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    No answer description available for this question.