Home / Civil Engineering / Estimating and Costing :: Discussion

Discussion :: Estimating and Costing

  1. Pick up the correct statement in case of water supply.

  2. A.

    Pipes laid in trenches and pipes fixed to walls are measured separately

    B.

    Cutting through walls and floors are included with the item

    C.

    Pipes are classified according to their sizes and quality

    D.

    In laying pipes, the method of jointing and fixing is specifically specified

    E.

    All the above.

    View Answer

    Workspace

    Answer : Option E

    Explanation :

    No answer description available for this question.


Be The First To Comment