  1. The expected out turn of 2.5 cm cement concrete floor per manson per day

  2. A.
    2.5 sqm
    B.

    5.0 sqm

    C.

    7.5 sqm

    D.

    10 sqm

    View Answer

    Workspace

    Answer : Option C