Discussion :: Docks and Harbours
-
The dock wall is designed as a gravity retaining wall and is tested for
|
A.
back fill pressure when the dock is empty |
|
B.
maximum water pressure from the dock without any back fill |
|
C.
the load charge transmitted to the dock by the movement of loaded vehicles or trains on the way |
|
D.
all of the above. |
Answer : Option D
Explanation :
No answer description available for this question.
Be The First To Comment

Whatsapp
Facebook