  1. For the network shown in the given figure, the expected time for the

  2. A.

    1-2 is 4

    B.

    2-3 is 7

    C.

    3-4 is 8

    D.

    all the above.

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    No answer description available for this question.