Pick up the correct statement from the following:
|
A.
The difference of latest occurence time and earliest expected time, is called slack |
|
B.
The activities connecting the events having zero slack, lie on the critical path |
|
C.
The critical path consumes the maximum time |
|
D.
All the above. |
Answer : Option D
Explanation :
No answer description available for this question.