  1. The difference between the time avail-to do a job and the time required to do the job, is known as

  2. A.

    event

    B.

    float

    C.

    duration

    D.

    constraint.

    View Answer

    Workspace

    Answer : Option B

    Explanation :

    No answer description available for this question.