  1. Asphalt is obtained from

  2. A.

     Petroleum distillation

    B.

     Bitumen distillation

    C.

     Plastic distillation

    D.

     None of these


  3. The normal curing period for lime mortar, is:

  4. A.

     1 day

    B.

     3 days

    C.

     7 days

    D.

     10 days


  5. Glazing is used to make earthenware

  6. A.

     hard

    B.

     soft

    C.

     porous

    D.

     impervious


  7. Pug mill is used for

  8. A.

     Preparation of clay

    B.

     Moulding of clay

    C.

     Drying of bricks

    D.

     Burning of bricks


  9. A pug mill is used for

  10. A.

     Softening brick earth

    B.

     Moulding brick earth

    C.

     Tempering brick earth

    D.

     Providing brick earth


  11. The nominal size of the modular brick is

  12. A.

     190 mm × 90 mm × 80 mm

    B.

     190 mm × 190 mm × 90 mm

    C.

     200 mm × 100 mm × 100 mm

    D.

     200 mm × 200 mm × 100 mm


  13. Clay and silt content in a good brick earth must be at least

  14. A.

     50 %

    B.

     40 %

    C.

     30 %

    D.

     25 %


  15. The initial setting time for ordinary Portland cement as per IS specifications should not be less than

  16. A.

     10 minutes

    B.

     30 minutes

    C.

     60 minutes

    D.

     600 minutes


  17. According to IS specifications, the compressive strength of ordinary Portland cement after three days should not be less than

  18. A.

     7 MPa

    B.

     11.5 MPa

    C.

     16 MPa

    D.

     21 MPa


  19. Crushing strength of a first class brick should not be less than

  20. A.

     3.5 N/mm²

    B.

     7.0 N/mm²

    C.

     10.5 N/mm²

    D.

     14.0 N/mm²