Home / Civil Engineering / Surveying :: Discussion

Discussion :: Surveying

  1. The correction applied to the measured base of length ‘L’ is

  2. A.

     Tension = (P - Ps)L/AE

    B.

     Sag = L³w²/24P² where w is the weight of tape/m

    C.

     Slope = (h²/2L) + (h⁴/8L³) where h is height difference of end supports

    D.

     All the above

    View Answer

    Workspace

    Answer : Option D

    Explanation :

    Explanation Not Provided


Be The First To Comment